Kuwait F-18 Super Hornet Program, Phase II- Design

The work included in this Facility is to Provide all management, tools, supplies, equipment and Labor necessary to deliver material and services required by the Kuwait Air Force in a manner that will ensure their quality, performance, schedule and operation, to Construct a One-Story General Purpose warehouse PEB Facility on Ahmad Al Jaber Air Base, in Kuwait. The Project Consists of Site Preparation, Concrete Foundations Concrete Masonry walls, Pre-Engineered Roof, Communication and associated electrical and mechanical HVAC duct system. We have to Provide a complete and useable Facility Pre-Engineered warehouse Building 52.0mX27.60m with a 5.8m H, Facility will accommodate 1435 SM. These requirement criteria for supply, installation and construction of the continues Stem walls concrete foundations, with slab on grade, Exterior walls Load bearing CMU wall with Cement Architectural unit Finish, walls fill the cavity with R20 insulation, Roofing system steel trusses R40 rigid insulation, Doors and Frames Heavy Duty HM doors and frames for outside and inside doors with HM frames, 3 Nos Sliding doors, manually operated, Ceilings 600mmX 600mm acoustical ceiling all Facility in admiration offices area , all CMU Walls surfaces finish with 2 coats paints & Primer, Flooring sealed with Epoxy paints, with Loading dock and concrete ramp.
Site utilities: Construct Exterior Concrete pavers and Asphalt pavement and Car Parking Sunshade including Sewer line system and Manholes, water supply line & manhole, Storm water system catch basin, Fire hydrant, and Electrical Lights Poles and Mechanical Yard.
Renovation Aircrew Training Facility: CLIN-0006: The work includes interior and exterior renovations to an existing, occupied facility where the training squadron is located. These renovations are intended to support various Aircraft training device and training classroom requirements.
The requirement to supply, installation and construct of continues concrete Foundations with slab on grade for Simulator, Interior CMU walls with cement plaster finish, doors and frames heavy duty HM doors and frames for outside and solid core wood doors with HM frames for inside, ceiling 600X600mm acoustical ceiling with grid, wall finishing with 2 coats paints & primer, flooring sealed with Epoxy paints. Raised floor system in communication rooms, Supply and install 3 Nos Roll up Doors manually operated including HVAC systems ductwork including disconnect switches air flow heater safety interlocks. Fire Protection: A Mass Notification System and install Fire Extinguishers, Supply fabrication and installation of all Electrical works and lighting test all electrical panels, cables, controls and lighting, Main Distribution Panel, Communication pathways, spaces, and equipment’s NIPR net, SIPR net and install CCTV Camera System.
C - Site Improvements: Site improvements to include Mechanical yard with chiller pad and electrical equipment’s, Including all Electro-Mechanical works.