Kuwait F-18 Super Hornet Program, Phase II- Design

The Kuwait F-18 Super Hornet Program Phase II was awarded to AGCO with the objective of providing all management, tools, supplies, equipment, and labor required to deliver materials and services needed by the Kuwait Air Force in a way that ensures their quality, performance, schedule, and operation, as well as to construct a one-story general purpose warehouse PEB facility on Ahmad Al Jaber Air Base in Kuwait. An electrical and mechanical HVAC duct system, concrete foundations, concrete masonry walls, a pre-engineered roof, communication. The 52.0 x 27.60 x 5.8 m pre-engineered warehouse building. 1435 SM may fit within. Architectural element that can support weight outside walls made of CMU and cement Lastly, fill the wall voids with R20 insulation. R40 rigid insulation roof system with steel trusses, robust doors and frames exterior and interior doors with HM frames, three manually controlled sliding doors, All facilities' acoustical ceilings measure 600 mm by 600 mm, and all CMU Wall surfaces are painted and primed twice. There is a loading dock, a concrete ramp, and epoxy paint to coat the flooring.
CLIN-0006 is a facility for aircrew training. Renovation: The work entails making modifications to both the inside and outside of a structure where the training squadron is currently housed. These updates are intended to fulfill the requirements of various aviation training equipment and training classes.
Site enhancements will comprise complete electro-mechanical work, a mechanical yard with a chiller pad, and electrical apparatus.