شركة مجموعة الغانم المشتركة

AL-GHANIM COMBINED GROUP

Projects

KAF

T​his Design-Build Project Consisting of Main Simulator Building along with 8 External Buildings. The project included new design and construction for Flight Training center where pilots are trained through simulator of C-130. 

learn more

Apron Charlie

AGCO participated as Prime Contractor and performed activities in milling two inches of old apron asphalt and repaving approximately 95,000 sq. meters with new asphalt, while maintaining existing grade and slope. AGCO did the respiring lane markers, area designators ("C" and "D"), and the helipad numbering system.
 

learn more

HAZMAT Building 

This Design Build project involves the design and construction of a Pre-engineered metal building system consisting of two separate areas. The facility, in its entirety, consists of a 30 m x 25 m Double story administrative office space, and a 30 m x 54 m hazardous materials (HAZMAT) vehicle maintenance area. 

learn more

Soccer Field & Running Track

Construction and installation of a filled synthetic turf system on the existing area inside of the running track and a new drainage system to maintain the area dry and serviceable at all times at Camp Arifjan, Kuwait.

learn more

Kuwait F-18 Super Hornet

The work included in this Facility is to Provide all management, tools, supplies, equipment and Labor necessary to deliver material and services required by the Kuwait Air Force in a manner that will ensure their quality, performance, schedule and operation, to Construct a One-Story General Purpose warehouse PEB Facility on Ahmad Al Jaber Air Base, in Kuwait. 

learn more

North Runway

The work described under this design-build contract consists of repair to the North Runway at the Ali Al Salem Air Base, Kuwait. 
Remove and replace the concrete keel section of runway 30R PCC end pavement. Remove and replace the south asphalt shoulder of runway 30R PCC end pavement. Mill and overlay runway asphalt section of 12L-30R. Seal any cracks in the asphalt section 12L-30R pavement area after milling has been completed and prior to placing new asphalt.

learn more