REPAIR NORTH RUNWAY 12L-30R, ALI AL SALEM AIR BASE, KUWAIT

The work described under this design-build contract consists of repair to the North Runway at the Ali Al Salem Air Base, Kuwait. Work shall consists of the following items:
1) Remove and replace the concrete keel section of runway 30R PCC end pavement.
2) Remove and replace the south asphalt shoulder of runway 30R PCC end pavement.
3) Mill and overlay runway asphalt section of 12L-30R.
4) Seal any cracks in the asphalt section 12L-30R pavement area after milling has been completed and prior to placing new asphalt.
5) Remove and replace joint sealant in all concrete of 12L-30R.
6) Concrete spall repair full depth section 12L-30R.
7) Concrete spall repair partial depth section 12L-30R.
8) Temporary and Permanent Markings and Striping Runway 12L-30R.
The contractor shall prepare 100 percent plans, specifications and support documents for this design-build project. USACE guide specifications shall be prepared incorporating the technical requirements contained herein. The Contractor shall coordinate with the US Army Corps of Engineers Resident Engineer (RE), US Army Corps of Engineers Contracting Officer Representative (COR), and the Ali Al Salem Airfield Management (BE) final design drawings for the project.
The Contractor shall prepare a Phasing Plan in accordance with Appendix B and the Contract Drawings. The Contractor shall coordinate the construction sequencing with the COR, Base Engineer, and Airfield
Management, with regards to sequencing, taxiway closures, laydown areas, haul routes, etc. prior to the submission of the Phasing Plan. The Phasing Plan shall show the sequencing for mobilization, construction activities, laydown areas, demobilization, etc. as specified on the Drawings and here within.